AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |
Back to Blog
Martin Energy Group Tipton Mo4/26/2021
Food waste deposited into anaerobic digester systems boosts biogas production and increases electricity revenues.Food waste is being routinely delivered to dairy digesters by waste haulers who thereby avoid high fees charged by landfills.
Farms are charging haulers about 20ton whereas landfills can charge as much as 70ton. The presence of packaging materials in food waste streams presents a barrier to efficient processing and biogas recovery. Designing a depackaging solution along with an MCR digester system creates a fully integrated energy system. After the client signs the Scope of Work Document, MCR proceeds with the site layout and structural drawings. Upon engineer review and approval of the structural drawings, the mechanical and electrical drawings are completed. Construction continues upon receipt of materials and equipment on site. Between 2002 and 2005, MCR installed five covered-lagoon digesters in Chile for the handling of swine manure and for carbon credits. Since then, MCR has provided engineering, procurement, and construction services in Ecuador, Mexico, and Australia. Or we can supply the digester design, manufacture the equipment, and provide expert guidance to your teams General Contractor to develop the project. You can trust our expertise to bring success to every aspect of your project, including (but not limited to), excavation, concrete, plumbing, wiring, and construction. Our parent company, Martin Energy Group (MEG), will be the primary engineering and technology systems provider for the biogas genset.
0 Comments
Read More
Leave a Reply. |